projects:ead-pls_-_ead_payload_launch_system
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
projects:ead-pls_-_ead_payload_launch_system [2015/12/15 10:28] – andyesser | projects:ead-pls_-_ead_payload_launch_system [2016/01/13 15:22] (current) – andyesser | ||
---|---|---|---|
Line 5: | Line 5: | ||
The Payload Launch system is designed to be a prototype of construction, | The Payload Launch system is designed to be a prototype of construction, | ||
- | For more information, | + | For more information, |
The Primary Mission Contact is Andy Esser [[aesser@eadyn.co.uk]] | The Primary Mission Contact is Andy Esser [[aesser@eadyn.co.uk]] | ||
Line 20: | Line 20: | ||
PLS-1 | PLS-1 | ||
* **Planned: | * **Planned: | ||
- | * **Launch: | + | * **Launch: |
* **Planned Altitude:** 20-30km | * **Planned Altitude:** 20-30km | ||
* **Payload: | * **Payload: | ||
Line 28: | Line 28: | ||
PLS-2 | PLS-2 | ||
* **Planned: | * **Planned: | ||
- | * **Launch: | + | * **Launch: |
* **Planned Altitude:** 30-40km | * **Planned Altitude:** 30-40km | ||
* **Payload: | * **Payload: | ||
* **Additional Sensors:** Barometer, Additional Camera | * **Additional Sensors:** Barometer, Additional Camera | ||
* **Status:** Planned | * **Status:** Planned |
projects/ead-pls_-_ead_payload_launch_system.1450175332.txt.gz · Last modified: 2015/12/15 10:28 by andyesser