UKHAS Wiki

UK High Altitude Society

User Tools

Site Tools


projects:habe

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
projects:habe [2011/07/27 11:43] – added solarbotics acudworthprojects:habe [2012/02/23 17:32] (current) – [Sponsors] acudworth
Line 4: Line 4:
 ===== Overview ===== ===== Overview =====
  
-This is a A Level Student run project based in Worcester. Blog - http://habexperiments.wordpress.com+This is a A Level Student run project based in Worcester. Blog - http://habe.acudworth.co.uk/blog
  
-HABE 1 was a partial success - full run down on my blog - http://habexperiments.wordpress.com+HABE 1 was a partial success - full run down on my blog - http://habe.acudworth.co.uk/blog
 Now I have a working tracking system, different experiments can now be carried out. HABE 2 is planned for launch in early August. Now I have a working tracking system, different experiments can now be carried out. HABE 2 is planned for launch in early August.
  
Line 34: Line 34:
 **__Update: 12/07/11__** **__Update: 12/07/11__**
  
-Well, HABE 1 was a partial success! Apart from complete camera failure the rest worked very well indeed, so overall, I'm very pleased with the flight. I have since created a blog where future updates will be posted (before they hit the wiki here!). So, check it out - http://habexperiments.wordpress.com+Well, HABE 1 was a partial success! Apart from complete camera failure the rest worked very well indeed, so overall, I'm very pleased with the flight. I have since created a blog where future updates will be posted (before they hit the wiki here!). So, check it out - http://habe.acudworth.co.uk/blog
  
  
-===== Launch Status - HABE =====+===== Launch Status - HABE =====
  
-**__Update: 12/07/11__**+**__Update: 16/02/12__**
  
-**//__CURRENT LAUNCH DATE: Early August__//**+**//__CURRENT LAUNCH DATE: Spring/Summer 2012__//**
  
  
-CAA Permission - Received - Cleared for launch between 1st & 5th August+CAA Permission - Too far in advance.
  
 Landing Predictions - Too far in advance. Landing Predictions - Too far in advance.
  
-Launch Status - Not Ready - Build in progress+Launch Status - Not Ready
  
  
Line 105: Line 105:
  
   * RoboSavvy - Supplied an arduino UNO - http://www.robosavvy.co.uk   * RoboSavvy - Supplied an arduino UNO - http://www.robosavvy.co.uk
 +
 +  * Plastock - Supplied 4 x 4mm sheets of polycarbonate - http://www.plastock.co.uk
 +
 +  * Alpha Micro - Supplied a uBlox 6 NEO-6Q GPS module - http://www.alphamicro.net/
 +
 +  * Richardson RFPD - Supplied 2 Sarantel GPS antennas - http://www.richardsonrfpd.com/
      
  
  
projects/habe.1311766982.txt.gz · Last modified: 2011/07/27 11:43 by acudworth

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki